BUILD WITH US

Plan filtration into the home from the start.

Coordinate entry points, equipment location, drainage, power and access before construction closes off the best options.

Start a project inquiry
Finished contemporary kitchen in a newly built home
DIAMOND WATER SYSTEMDesigned for everyday living.
EXPLORE

What matters on this page.

01

Early planning

Confirm the intended system and services before final plumbing rough-in.

02

Clear coordination

Provide builders and trades with practical location and access requirements.

03

Completion ready

Commission the system, record details and explain maintenance clearly.

WATER • HOME • FAMILYClear advice, thoughtful systems.
FOR BUILDERS & HOMEOWNERS

Protect the installation outcome before site constraints decide it.

A short design conversation early in the build can improve equipment access, visual integration and future serviceability.

  • Main water-line entry and bypass planning
  • Equipment clearance and drainage
  • Power and UV requirements where applicable
WHY EARLY MATTERS

The decisions that close off options

Water treatment is routinely left until the building is finished, and by then the position of the supply entry, the services available near it and the space around it have all been settled by somebody who was not thinking about treatment equipment. None of those is expensive to get right at design stage. All of them are expensive, and sometimes impossible, to change afterwards. On some finished properties a configuration that would have been straightforward simply is not available any more.

  • Position, services and space are settled early by default
  • Cheap to allocate at design stage
  • Sometimes impossible to retrofit
WHAT TO ALLOW

What a treatment system needs from the building

Space at or near the point of entry, sized for the configuration rather than for a single cabinet, because a property with hardness and a taste concern needs more than one piece of equipment. A drain connection where the configuration includes anything that regenerates. Power at the equipment position. And service access retained once walls and finishes are in, which is the requirement most often lost because it is invisible until the first media change falls due.

  • Space sized for the configuration, not one cabinet
  • Drainage where equipment regenerates
  • Power at the equipment position
  • Service access retained after finishes
WHAT WE PROVIDE

What the project team receives

A written set of requirements: the space envelope, the services needed at that position, the access to retain, and the commissioning steps the plumbing team will work from. On a property with a private well, testing comes first, because what gets specified depends on what the testing shows and that cannot be assumed from the plans.

  • Space envelope and services at the position
  • Service access to retain
  • Commissioning steps for the plumbing team
  • Testing first where the property is on a well

How we work with project teams Systems we install

FAQ

When should water treatment be planned into a build?

While the services are being planned, and confirmed before the walls close. That is when space at the point of entry, drainage, power and future service access can simply be allocated instead of retrofitted.

FAQ

How much space should we allow?

It depends on the configuration, which depends on what the water needs treating for, so the honest answer at design stage is to allow generously and confirm once the supply is known. A property needing both softening and filtration requires more than one cabinet's worth of room plus space to work around them.

FAQ

Can you specify before the well is tested?

No. An untreated supply has to be tested before anything is specified. At design stage the sensible approach is to allocate generous space and services and confirm the configuration when results are available.

READY FOR THE NEXT STEP?

Tell us about the project.

Share the location, stage and expected completion timing.