Early planning
Confirm the intended system and services before final plumbing rough-in.
Coordinate entry points, equipment location, drainage, power and access before construction closes off the best options.
Start a project inquiry→
Confirm the intended system and services before final plumbing rough-in.
Provide builders and trades with practical location and access requirements.
Commission the system, record details and explain maintenance clearly.

A short design conversation early in the build can improve equipment access, visual integration and future serviceability.
Water treatment is routinely left until the building is finished, and by then the position of the supply entry, the services available near it and the space around it have all been settled by somebody who was not thinking about treatment equipment. None of those is expensive to get right at design stage. All of them are expensive, and sometimes impossible, to change afterwards. On some finished properties a configuration that would have been straightforward simply is not available any more.
Space at or near the point of entry, sized for the configuration rather than for a single cabinet, because a property with hardness and a taste concern needs more than one piece of equipment. A drain connection where the configuration includes anything that regenerates. Power at the equipment position. And service access retained once walls and finishes are in, which is the requirement most often lost because it is invisible until the first media change falls due.
A written set of requirements: the space envelope, the services needed at that position, the access to retain, and the commissioning steps the plumbing team will work from. On a property with a private well, testing comes first, because what gets specified depends on what the testing shows and that cannot be assumed from the plans.
While the services are being planned, and confirmed before the walls close. That is when space at the point of entry, drainage, power and future service access can simply be allocated instead of retrofitted.
It depends on the configuration, which depends on what the water needs treating for, so the honest answer at design stage is to allow generously and confirm once the supply is known. A property needing both softening and filtration requires more than one cabinet's worth of room plus space to work around them.
No. An untreated supply has to be tested before anything is specified. At design stage the sensible approach is to allocate generous space and services and confirm the configuration when results are available.
Share the location, stage and expected completion timing.