Coordinate entry points, equipment location and services before project completion.
We work with homeowners, builders, designers and plumbing professionals to plan filtration at the right stage of a project.
Build with us→
Coordinate entry points, equipment location and services before project completion.
Plan practical filtration without compromising the visual result.
Share clear system and commissioning requirements for a smooth installation.

Early coordination protects space, access, drainage and serviceability while reducing last-minute changes on site. Water treatment is one of the few services that is routinely left until the building is finished, and by then the decisions that matter have already been made by somebody who was not thinking about it.
Four things, and all four are cheap at design stage and expensive afterwards. Space at or near the point of entry, sized for the configuration rather than for one cabinet. A drain connection where the configuration includes equipment that regenerates. Power where the equipment needs it. And room to open and service the equipment once walls and finishes are in. The last of these is the one most often lost, because it is invisible until the first media change falls due.
The first is while the services are still being planned, when space, drainage and power can simply be allocated. The second is before the walls close, when the position can still be adjusted. After that the options narrow to whatever the finished building allows, which on some projects means a configuration that would have been straightforward becomes impractical.
A written set of requirements for the configuration a property needs: the space envelope, the services required at that position, the access to retain for servicing, and the commissioning steps. On a property with a private well that includes the testing step, because what gets specified depends on what the testing shows and that cannot be assumed at design stage.
While the services are being planned, and confirmed before the walls close. Space at the point of entry, drainage, power and future service access are all straightforward to allocate at that stage and awkward to retrofit once finishes are in.
Not for a property on a private well. An untreated supply has to be tested before anything is specified, so the sensible approach at design stage is to allocate generous space and services and confirm the configuration once results are available.
Either, and often both. The requirements we provide are written so a plumbing team can work from them directly, while the specification decisions stay with whoever is making them on the project.
Tell us where the project is up to and we’ll outline the next technical steps.